Technical Modeling & Design
Direct Execution of Construction Documents and BIM Data Construction
Detailed design resolution reflecting the intended plan
Construction phase BIM model development and model-based drawing production.
Establishing the Most Suitable BIM for Design, Construction, and Fabrication Stages
· Building a continuous BIM model that can be utilized at all stages
· Constructing BIM models optimized for the characteristics of each trade (architecture, structure, MEP)
· Setting parameters and creating families for the most efficient data
modification
Bimsontop creates BIM data that can be practically used in the design, construction, and fabrication stages. Libraries define the shape information, variables, and properties of each component, exposing different levels of information detail to be used at all stages. This BIM library adheres to consistent quality and capacity, enabling efficient project file management.
Additionally, experienced professionals from both design and construction fields collaborate to establish modeling strategies that can be used across all trades (architecture, structure, MEP) and that can be reasonably converted or extended. In cases of irregular or curved shapes, we establish modeling and family strategies that can respond most efficiently to data modifications, and we develop conversion processes that can generate BIM models most efficiently from 2D shapes or models from Rhino, SketchUp, etc., to quickly respond to design changes.
Creation of BIM-based Construction Documents Utilizing Extensive Design Development Experience
· Detailing to match the original design intent in construction documents
· Comprising experts with extensive experience in BIM-based construction
documents for multi-family housing, irregular shapes, etc.
· Building specialized libraries and project environment setting information for
BIM drawings
When plans are detailed from the design phase to the construction documents phase, BIM can be applied to implement the design development. We possess not only modeling capabilities but also design development experience and experts essential for the design phase, allowing for rational BIM-based design from both design and data perspectives by understanding standard details and various legal requirements based on practical design experience.
Bimsontop employs various technologies such as drawing automation and model automation through programming in the construction documents phase, where a large number of deliverables must be produced in a short period. We also establish initial project setting strategies to ensure rational conversion and expansion of the model in response to design changes.